To promote the new concept and information enable system following are his expectations
Modification Projects incorporated:
- Wear out of brake shoe for Hoisting motions,
- Wear out of long travel wheels (Skew and Drifts),
- Temperature of Gear Boxes / Motors etc.
Operational Information:
- No of operations, no of start / hour
- No of backtracking operation
- Pulsating operation.
- Operational Hours, Load spectrum, SWP info.
- Alarm history and duration (Overloading, Overspeed etc)
- Hoist / Crane duty as per Design